Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China

The General Electric 8410-NS-PS is a power supply monitor module for GE PAC8000 industrial automation applications. Documented product details include PAC8000 Node services; power supply monitor; accommodates two controllers/EBIMs. Confirm the complete model code, hardware revision and supplied condition against the installed equipment before replacement.
Verify that the supplied item is marked 8410-NS-PS and that its power supply monitor module form, connectors and revision agree with the approved GE PAC8000 receiving record.
For 8410-NS-PS, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact 8410-NS-PS record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
8410-NS-PS technical scope: Ground terminals: M4 screw terminal (x2); External power: 12.0 V dc (±5%); Operating Temperature: – 40°C to + 70°C; Storage Temperature: – 40°C to + 85°C; Relative Humidity: 5 to 95% RH (non-condensing).
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match 8410-NS-PS to the approved GE PAC8000 receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected power supply monitor module path.
Active / Available from OEM
8410-NS-PS is a General Electric power supply monitor module associated with the GE PAC8000 platform. It supports the documented power-conversion and distribution duty assigned to the installed rack or cabinet position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.