Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China
IC697CMM742-LL is a GE ethernet module used within the GE Fanuc Series 90-70 PLC architecture. It provides the specified ethernet module function while retaining the complete order code, hardware execution and receiving-system compatibility during replacement. Its documented operating voltage is +5 VDC and +12 VDC (from PLC backplane).
Verify that the supplied item is marked IC697CMM742-LL and that its ethernet module form, connectors and revision agree with the approved GE 90-70 Series PLC receiving record.
For IC697CMM742-LL, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact IC697CMM742-LL record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
IC697CMM742-LL technical scope: Operating Voltage: +5 VDC and +12 VDC (from PLC backplane); Internal Fuse: 5 × 20 mm, 250 V, 1.0 A (slow-blow); Station Manager Port: RS-232 (RJ-11, 300–19200 bps); Operating Temperature: 0°C to +55°C; Humidity: 5% to 95% non-condensing.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match IC697CMM742-LL to the approved GE 90-70 Series PLC receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected ethernet module path.
Obsolete/Discontinued by OEM
IC697CMM742-LL is a General Electric ethernet module associated with the GE 90-70 Series PLC platform. It supports the documented automation function assigned to its installed module, rack or cabinet position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.