DS200SDCIG1AHB is a GE dc power supply and instrumentation board used within the GE Speedtronic Mark V and Mark VI turbine-control architecture. It provides the specified dc power supply and instrumentation board function while retaining the complete order code, hardware execution and receiving-system compatibility during replacement. Its documented hardware role is DC Power Supply and Instrumentation Board.
Verify that the supplied item is marked DS200SDCIG1AHB and that its dc power supply and instrumentation board form, connectors and revision agree with the approved GE Mark V and Mark VI Turbine Controls receiving record.
For DS200SDCIG1AHB, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact DS200SDCIG1AHB record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
DS200SDCIG1AHB technical scope: System Platform: GE Mark V and Mark VI turbine and drive control systems; Hardware Format: printed circuit board; Functional Role: DC Power Supply and Instrumentation Board function in the documented GE Mark V and Mark VI Speedtronic architecture; Interface Basis: Matching connectors, terminal boards and rack hardware; Product Type: DC Power Supply and Instrumentation Board.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match DS200SDCIG1AHB to the approved GE Mark V and Mark VI Turbine Controls receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected dc power supply and instrumentation board path.
Obsolete/Discontinued by OEM
DS200SDCIG1AHB is a General Electric dc power supply and instrumentation board associated with the GE Mark V and Mark VI Turbine Controls platform. It supports the documented power-conversion and distribution duty assigned to the installed rack or cabinet position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.