Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China
DS200TCDAG1BFD is a GE digital i/o card used within the GE Speedtronic Mark V and Mark VI turbine-control architecture. It provides the specified digital i/o card function while retaining the complete order code, hardware execution and receiving-system compatibility during replacement. Its documented functional acronym is TCDA.
Verify that the supplied item is marked DS200TCDAG1BFD and that its digital i/o card form, connectors and revision agree with the approved GE Mark V and Mark VI Turbine Controls receiving record.
For DS200TCDAG1BFD, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact DS200TCDAG1BFD record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
DS200TCDAG1BFD technical scope: Functional Acronym: TCDA; PCB Coating: Normal Coating; Humidity: 5-95%; System Platform: GE Speedtronic turbine-control architecture; Interface Basis: Matching connectors, terminal boards and rack hardware.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match DS200TCDAG1BFD to the approved GE Mark V and Mark VI Turbine Controls receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected digital i/o card path.
Obsolete/Discontinued by OEM
DS200TCDAG1BFD is a General Electric digital i/o card associated with the GE Mark V and Mark VI Turbine Controls platform. It interfaces the documented field signals with the control system through the assigned channels, terminals and installed I/O position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.