Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China

The General Electric IS200TVBAH2A is a vibration input terminal board for GE Mark VIe industrial automation applications. Documented product details include GE Boards & Turbine Control; Mark VIe & Mark VIeS Control Systems; industrial automation system. Confirm the complete model code, hardware revision and supplied condition against the installed equipment before replacement.
Verify that the supplied item is marked IS200TVBAH2A and that its vibration input terminal board form, connectors and revision agree with the approved GE Mark VIe receiving record.
For IS200TVBAH2A, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact IS200TVBAH2A record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
IS200TVBAH2A technical scope: Series: Mark VIe Speedtronic; Functional Acronym: TVBA; Product Type: Vibration Input Terminal; PCB Coating: Conformal Coating; Voltage Rating: 24 V DC.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match IS200TVBAH2A to the approved GE Mark VIe receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected vibration input terminal board path.
Active / Available from OEM
IS200TVBAH2A is a General Electric vibration input terminal board associated with the GE Mark VIe platform. It interfaces the documented field signals with the control system through the assigned channels, terminals and installed I/O position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.