Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China

The General Electric IS210WETAH1A is a analog input module for GE Mark VIe industrial automation applications. Documented product details include Energy for the Mark VIe; Wind Turbine Control Series; Input Channels 16 single-ended. Confirm the complete model code, hardware revision and supplied condition against the installed equipment before replacement.
Verify that the supplied item is marked IS210WETAH1A and that its analog input module form, connectors and revision agree with the approved GE Mark VIe receiving record.
For IS210WETAH1A, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact IS210WETAH1A record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
IS210WETAH1A technical scope: Input Signal Types: 4–20 mA current loops; Resolution: 16-bit resolution; Operating Temperature: -40°C to +70°C (-40°F to +158°F); Humidity: 5–95% relative humidity (non-condensing); Product Type: Analog input module.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match IS210WETAH1A to the approved GE Mark VIe receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected analog input module path.
Active / Available from OEM
IS210WETAH1A is a General Electric analog input module associated with the GE Mark VIe platform. It interfaces the documented field signals with the control system through the assigned channels, terminals and installed I/O position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.