Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China

The General Electric IS230SNAOH2A is a analog output module for GE Mark VIe industrial automation applications. Documented product details include Analog output Pack under Mark VIe; High-Density Board; for GE Mark VIe systems; Speedtronic Turbine Controller; industrial automation system. Confirm the complete model code, hardware revision and supplied condition against the installed equipment before replacement.
Verify that the supplied item is marked IS230SNAOH2A and that its analog output module form, connectors and revision agree with the approved GE Mark VIe receiving record.
For IS230SNAOH2A, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact IS230SNAOH2A record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
IS230SNAOH2A technical scope: Output Current: 0-20mA or 4-20mA; Power Consumption: 15W; Communication Interface: Modbus RTU; Operating Temperature Range: -20°C to +55°C; Input Range: -10 V to +10 V.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match IS230SNAOH2A to the approved GE Mark VIe receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected analog output module path.
Active / Available from OEM
IS230SNAOH2A is a General Electric analog output module associated with the GE Mark VIe platform. It interfaces the documented field signals with the control system through the assigned channels, terminals and installed I/O position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.