Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China

The General Electric QPH-2D100-S2P is a hand-held operator interface for the GE QuickPanel platform. It provides a local operator interface for machine monitoring, status display and control. Confirm the complete model code, hardware revision, interfaces and supplied condition against the installed equipment before replacement.
Verify that the supplied item is marked QPH-2D100-S2P and that its hand-held operator interface form, connectors and revision agree with the approved GE QuickPanel receiving record.
For QPH-2D100-S2P, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact QPH-2D100-S2P record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
QPH-2D100-S2P technical scope: Display: 6-inch passive STN color touchscreen; Enclosure Type: Hand-held device with function keys and emergency stop capabilities; Power Input: 24V DC (20.4–27.6 VDC); Software: Requires QuickDesigner version 3.7 or greater for programming; Input Voltage: 24 VDC.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match QPH-2D100-S2P to the approved GE QuickPanel receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected hand-held operator interface path.
Obsolete/Discontinued by OEM
QPH-2D100-S2P is a General Electric hand-held operator interface associated with the GE QuickPanel platform. It supports the documented automation function assigned to its installed module, rack or cabinet position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.