Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China
EPRO PR6423/014-110 CON021 is an 8 mm eddy-current sensor chain using the documented CON021 signal converter for noncontact shaft measurement.
Retain the complete PR6423 suffix, CON021 execution, cable route, target material and monitor scaling when replacing the chain.
EPRO PR6423/014-110 CON021 is an 8 mm eddy-current sensor chain using the documented CON021 signal converter for noncontact shaft measurement. The documented selection record identifies Product Type: Eddy-current sensor chain; Probe Family: PR6423, 8 mm; Order Suffix: /014-110.
Retain the complete PR6423 suffix, CON021 execution, cable route, target material and monitor scaling when replacing the chain. Use the PR6423 probe with the specified CON021 converter. Confirm converter execution, output and monitor scaling. Use the supplied nameplate and current project documentation as the final order-stage reference.
Use the PR6423 probe with the specified CON021 converter.
Apply this check to the supplied PR6423/014-110 CON021 and the current project record before commissioning.
Confirm converter execution, output and monitor scaling.
Apply this check to the supplied PR6423/014-110 CON021 and the current project record before commissioning.
Preserve cable length, connector condition and separation.
Apply this check to the supplied PR6423/014-110 CON021 and the current project record before commissioning.
Identity: Confirm the complete PR6423/014-110 CON021 marking and the receiving equipment before removal.
Configuration: Retain the complete PR6423 suffix, CON021 execution, cable route, target material and monitor scaling when replacing the chain.
Commissioning: Restore only the approved wiring and settings, then prove every affected signal or control path.
Availability for PR6423/014-110 CON021 is confirmed at quotation. The complete model, condition and included hardware are checked before shipment.
Any alternative is proposed only after the receiving system, interfaces, configuration and commissioning requirements have been reviewed.