Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China
IC697CMM741 is a GE communications module used within the GE Fanuc Series 90-70 PLC architecture. It provides the specified communications module function while retaining the complete order code, hardware execution and receiving-system compatibility during replacement. Its documented platform is GE Series 90-70.
Verify that the supplied item is marked IC697CMM741 and that its communications module form, connectors and revision agree with the approved GE 90-70 Series PLC receiving record.
For IC697CMM741, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact IC697CMM741 record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
IC697CMM741 technical scope: Platform: GE Series 90-70; Hardware Format: rack/backplane module; System Platform: GE Fanuc Series 90-70 PLC architecture; Functional Role: Communications Module function in the documented GE Fanuc Series 90-70 architecture; Product Type: Communications Module.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match IC697CMM741 to the approved GE 90-70 Series PLC receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected communications module path.
Obsolete/Discontinued by OEM
IC697CMM741 is a General Electric communications module associated with the GE 90-70 Series PLC platform. It supports the documented industrial communication path between the controller, network and connected automation equipment. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.