IS200VSVOH1B is a GE servo control board used within the GE Speedtronic Mark V and Mark VI turbine-control architecture. It provides the specified servo control board function while retaining the complete order code, hardware execution and receiving-system compatibility during replacement. Its documented control platform is Mark VI VSVO servo control.
Verify that the supplied item is marked IS200VSVOH1B and that its servo control board form, connectors and revision agree with the approved GE Mark V and Mark VI Turbine Controls receiving record.
For IS200VSVOH1B, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact IS200VSVOH1B record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
IS200VSVOH1B technical scope: Control Platform: Mark VI VSVO servo control; Servo Output Capacity: Four servo valves per VSVO; LVDT Inputs: Six windings per TSVO terminal board; Pulse-rate Inputs: Two total per VSVO; Internal Sample Rate: 200 Hz.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match IS200VSVOH1B to the approved GE Mark V and Mark VI Turbine Controls receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected servo control board path.
Obsolete/Discontinued by OEM
IS200VSVOH1B is a General Electric servo control board associated with the GE Mark V and Mark VI Turbine Controls platform. It supports the documented control, interface or signal-processing duty assigned to its installed board position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.