Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China
DS200DCFBG1BNC is a GE power supply board used within the GE Speedtronic Mark V and Mark VI turbine-control architecture. It provides the specified power supply board function while retaining the complete order code, hardware execution and receiving-system compatibility during replacement. Its documented functional acronym is DCFB.
Verify that the supplied item is marked DS200DCFBG1BNC and that its power supply board form, connectors and revision agree with the approved GE Mark V and Mark VI Turbine Controls receiving record.
For DS200DCFBG1BNC, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact DS200DCFBG1BNC record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
DS200DCFBG1BNC technical scope: Functional Acronym: DCFB; Board Revision: B Revision; PCB Coating: Normal Coating; Voltage Supply: 38 to 115 VAC or 38 VDC; Frequency Range (-3 dB): 0–500 kHz.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match DS200DCFBG1BNC to the approved GE Mark V and Mark VI Turbine Controls receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected power supply board path.
Obsolete/Discontinued by OEM
DS200DCFBG1BNC is a General Electric power supply board associated with the GE Mark V and Mark VI Turbine Controls platform. It supports the documented power-conversion and distribution duty assigned to the installed rack or cabinet position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.