Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China
8020-CE-RH is a GE 16-pin cable for 8618 (1m) used within the GE Speedtronic turbine-control architecture. It provides the specified 16-pin cable for 8618 (1m) function while retaining the complete order code, hardware execution and receiving-system compatibility during replacement. Its documented connector type is 16-pin mass termination interface (8618 series).
Verify that the supplied item is marked 8020-CE-RH and that its 16-pin cable for 8618 (1m) form, connectors and revision agree with the approved GE Mark VIe receiving record.
For 8020-CE-RH, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact 8020-CE-RH record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
8020-CE-RH technical scope: Connector type: 16-pin mass termination interface (8618 series); Cable length: 1 meter nominal; Application class: Industrial I/O carrier linking (non-field wiring); System voltage domain: Industrial DC backplane (system-defined, typically 24V DC architecture in PAC8000 systems); Max extension configuration: p to multiple extender pairs per node (system-limited architecture rule).
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match 8020-CE-RH to the approved GE Mark VIe receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected 16-pin cable for 8618 (1m) path.
Active / Available from OEM
8020-CE-RH is a General Electric 16-pin cable for 8618 (1m) associated with the GE Mark VIe platform. It supports the documented automation function assigned to its installed module, rack or cabinet position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.