Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China

IS200TBAIH1CDC is a GE Mark VIe analog input/output terminal board used to connect field transmitters and analog output loops to the control system. It provides ten analog input paths and two analog output paths, while compatibility depends on the complete board revision, connected I/O pack, wiring method and simplex or TMR architecture.
Verify that the supplied item is marked IS200TBAIH1CDC and that its analog input/output terminal board form, connectors and revision agree with the approved GE Mark VIe receiving record.
For IS200TBAIH1CDC, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact IS200TBAIH1CDC record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
IS200TBAIH1CDC technical scope: Control Platform: GE Mark VIe; Compatible I/O Pack: IS220PAICH1A; Analog Inputs: 10 voltage or current input channels; Analog Outputs: 2 current output channels; Output Signal Range: 0 to 20 mA DC.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match IS200TBAIH1CDC to the approved GE Mark VIe receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected analog input/output terminal board path.
Active / Available from OEM
IS200TBAIH1CDC is a General Electric analog input/output terminal board associated with the GE Mark VIe platform. It interfaces the documented field signals with the control system through the assigned channels, terminals and installed I/O position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.