Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China
The General Electric IS210BPPBH2BKD is a mark vi printed circuit board for GE Mark VIe industrial automation applications. Documented product details include Mark VI IS200 Series; small circuit board that functions; as an auxiliary or daughterboard; for the WETA board. Confirm the complete model code, hardware revision and supplied condition against the installed equipment before replacement.
Verify that the supplied item is marked IS210BPPBH2BKD and that its mark vi printed circuit board form, connectors and revision agree with the approved GE Mark VIe receiving record.
For IS210BPPBH2BKD, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact IS210BPPBH2BKD record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
IS210BPPBH2BKD technical scope: Category Series: Mark VI Speedtronic; Functional Acronym: BPPB; Functional Description: Printed Circuit Board; PCB Coating: Conformal Coating; Series: GE Mark VIe.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match IS210BPPBH2BKD to the approved GE Mark VIe receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected mark vi printed circuit board path.
Active / Available from OEM
IS210BPPBH2BKD is a General Electric mark vi printed circuit board associated with the GE Mark VIe platform. It supports the documented control, interface or signal-processing duty assigned to its installed board position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.