Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China
The General Electric IS210TREAH1A is a turbine emergency trip terminal board for GE Mark VIe industrial automation applications. Documented product details include Connect and manage various signals; Ensuring reliable communication; Between the control system. Confirm the complete model code, hardware revision and supplied condition against the installed equipment before replacement.
Verify that the supplied item is marked IS210TREAH1A and that its turbine emergency trip terminal board form, connectors and revision agree with the approved GE Mark VIe receiving record.
For IS210TREAH1A, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact IS210TREAH1A record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
IS210TREAH1A technical scope: Product Type: Turbine Emergency Trip Terminal Board; Temperature: -30 to 65℃; MPU pulse rate range: 2 Hz to 20 kHz; MPU pulse rate accuracy: 0.05 percent of reading; Number of inputs: 14 inputs.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match IS210TREAH1A to the approved GE Mark VIe receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected turbine emergency trip terminal board path.
Active / Available from OEM
IS210TREAH1A is a General Electric turbine emergency trip terminal board associated with the GE Mark VIe platform. It supports the documented control, interface or signal-processing duty assigned to its installed board position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.