Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China

The General Electric IS215WEMAH1B is a inverter main control board for GE Mark VIe industrial automation applications. Documented product details include A Wind Energy Main Converter; Control for ESS wind turbines; Mark VIe Speedtronic control system series. Confirm the complete model code, hardware revision and supplied condition against the installed equipment before replacement.
Verify that the supplied item is marked IS215WEMAH1B and that its inverter main control board form, connectors and revision agree with the approved GE Mark VIe receiving record.
For IS215WEMAH1B, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact IS215WEMAH1B record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
IS215WEMAH1B technical scope: Series: Mark VI Speedtronic; Functional Acronym: WEMA; Functional Description: Wind Energy Main Converter Control; PCB Coating: Conformal Coating; Product Type: Inverter main control board.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match IS215WEMAH1B to the approved GE Mark VIe receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected inverter main control board path.
Active / Available from OEM
IS215WEMAH1B is a General Electric inverter main control board associated with the GE Mark VIe platform. It supports the documented control, interface or signal-processing duty assigned to its installed board position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.