Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China
The General Electric IS420PUAAH1A is a universal input/output module for GE Mark VIe industrial automation applications. Documented product details include Mark VIe & Mark VIeS Control Systems; designed for use within distributed; control systems and BOP control systems. Confirm the complete model code, hardware revision and supplied condition against the installed equipment before replacement.
Verify that the supplied item is marked IS420PUAAH1A and that its universal input/output module form, connectors and revision agree with the approved GE Mark VIe receiving record.
For IS420PUAAH1A, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact IS420PUAAH1A record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
IS420PUAAH1A technical scope: Series: Mark VIe/Mark VIeS; Product Type: Universal Input-Output Pack; Functional Abbreviation: PUAA; Operating Temperature: -40 to +158 °F; Humidity: 5-95% non-condensing.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match IS420PUAAH1A to the approved GE Mark VIe receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected universal input/output module path.
Active / Available from OEM
IS420PUAAH1A is a General Electric universal input/output module associated with the GE Mark VIe platform. It interfaces the documented field signals with the control system through the assigned channels, terminals and installed I/O position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.