Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China
The General Electric WESDAC D20ME GE-HARRIS 820-0468/00 is a substation controller motor for GE Multilin industrial automation applications. Documented product details include Substation Controller; D200 Multi Processor Gateway; Multilin D20/D200 Substation; Controllers. Confirm the complete model code, hardware revision and supplied condition against the installed equipment before replacement.
Verify that the supplied item is marked WESDAC D20ME GE-HARRIS 820-0468/00 and that its substation controller motor form, connectors and revision agree with the approved GE Multilin receiving record.
For WESDAC D20ME GE-HARRIS 820-0468/00, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact WESDAC D20ME GE-HARRIS 820-0468/00 record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
WESDAC D20ME GE-HARRIS 820-0468/00 technical scope: Product Type: Substation Controller; Category Series: D200 Multi; Operating Voltage: 120V AC / 24V DC; Communication Protocols: IEC 61850,MODBUS RTU; Processing Speed: 100 MIPS.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match WESDAC D20ME GE-HARRIS 820-0468/00 to the approved GE Multilin receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected substation controller motor path.
Obsolete/Discontinued by OEM
WESDAC D20ME GE-HARRIS 820-0468/00 is a General Electric substation controller motor associated with the GE Multilin platform. It supports the documented controller execution, communications and configuration functions assigned to the installed processor position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.