Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China

The General Electric IC695PSD040F is a dc power supply module for PACSystems RX3i industrial automation applications. Documented product details include DC Power Supply, 40 Watts; 40-Watt supply that operates; from an input voltage source; in the range of 18 VDC to 30 VDC. Confirm the complete model code, hardware revision and supplied condition against the installed equipment before replacement.
Verify that the supplied item is marked IC695PSD040F and that its dc power supply module form, connectors and revision agree with the approved PACSystems RX3i receiving record.
For IC695PSD040F, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact IC695PSD040F record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
IC695PSD040F technical scope: Nominal Rated Voltage: 24 VDC; Input Power: 60 Watts maximum at full load; Inrush Current: 4 Amps, 100 milliseconds maximum; Terminal Current: 6 Amps; Load Capacity: 40 Watts.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match IC695PSD040F to the approved PACSystems RX3i receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected dc power supply module path.
Active / Available from OEM
IC695PSD040F is a General Electric dc power supply module associated with the PACSystems RX3i platform. It supports the documented power-conversion and distribution duty assigned to the installed rack or cabinet position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.