Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China

The General Electric IS215WEPAH2BDA IS200AEPAH1BPH is a pcb wind energy pitch axis for GE Mark VIe industrial automation applications. Documented product details include Wind Energy Pitch Axis; for use within the greater Mark VIe; Speedtronic control system series; PCB printed circuit board. Confirm the complete model code, hardware revision and supplied condition against the installed equipment before replacement.
Verify that the supplied item is marked IS215WEPAH2BDA IS200AEPAH1BPH and that its pcb wind energy pitch axis form, connectors and revision agree with the approved GE Mark VIe receiving record.
For IS215WEPAH2BDA IS200AEPAH1BPH, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact IS215WEPAH2BDA IS200AEPAH1BPH record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
IS215WEPAH2BDA IS200AEPAH1BPH technical scope: Series: Mark VIe & Mark VIeS Control Systems; Functional Acronym: WEPA; PCB Coating: Conformal Coating; Functional Revision 1: B grade; Product Type: PCB Wind Energy Pitch Axis.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match IS215WEPAH2BDA IS200AEPAH1BPH to the approved GE Mark VIe receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected pcb wind energy pitch axis path.
Active / Available from OEM
IS215WEPAH2BDA IS200AEPAH1BPH is a General Electric pcb wind energy pitch axis associated with the GE Mark VIe platform. It supports the documented automation function assigned to its installed module, rack or cabinet position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.