Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China
The CP can operate as a DP master or a DP slave. These roles are mutually exclusive. Other documented communication services and resource limits must be evaluated within the configured S7-300 project.
A nine-pin female D-sub connects the electrical PROFIBUS interface. This DA02 execution is not the optical CP 342-5 FO and is not an Ethernet CP. Match bus rate, termination, shielding and segment layout to the installation.
The archived specification used here identifies DA02 hardware from version 1 and firmware V4.0.0. Later DA03 documentation includes differences; use the applicable OEM replacement notes and the installed project when considering migration.
Provide the complete 6GK7342-5DA02-0XE0 marking, hardware/firmware revision, S7-300 CPU and STEP 7 version. Identify the configured DP role and any FDL or S7 services so the offered processor can be assessed against the actual project.
Confirm condition, quantity, diagnostic evidence and included connectors in writing. Record the network address and configuration backup before replacement. A DA03 proposal requires the OEM replacement-compatibility review, not an assumption based only on the CP 342-5 family name.
OEM lifecycle: Discontinued / End of product lifecycle. Siemens SiePortal identifies this exact DA02 order number as discontinued and lists 6GK7342-5DA03-0XE0 as its successor.
Moore Automated supports sourcing for maintained S7-300 installations. Written checks of revision, condition and configuration requirements help define the replacement scope.