Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China
DS200TCTGG1AFF is a GE simplex trip board used within the GE Speedtronic Mark V and Mark VI turbine-control architecture. It provides the specified simplex trip board function while retaining the complete order code, hardware execution and receiving-system compatibility during replacement. Its documented functional description is Simplex Trip Board.
Verify that the supplied item is marked DS200TCTGG1AFF and that its simplex trip board form, connectors and revision agree with the approved GE Mark V and Mark VI Turbine Controls receiving record.
For DS200TCTGG1AFF, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact DS200TCTGG1AFF record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
DS200TCTGG1AFF technical scope: Functional Description: Simplex Trip Board; PCB Coating: Normal Coating; System Platform: GE Speedtronic Mark V and Mark VI turbine-control architecture; Functional Role: Simplex Trip Board function in the documented GE Mark V and Mark VI Speedtronic architecture; Hardware Format: turbine-control board, terminal board or rack assembly.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match DS200TCTGG1AFF to the approved GE Mark V and Mark VI Turbine Controls receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected simplex trip board path.
Obsolete/Discontinued by OEM
DS200TCTGG1AFF is a General Electric simplex trip board associated with the GE Mark V and Mark VI Turbine Controls platform. It supports the documented control, interface or signal-processing duty assigned to its installed board position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.