Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China
DS200UCPBG5AFB is a GE i/o engine cpu board used within the GE Speedtronic Mark V and Mark VI turbine-control architecture. It provides the specified i/o engine cpu board function while retaining the complete order code, hardware execution and receiving-system compatibility during replacement. Its documented functional acronym is UCPB.
Verify that the supplied item is marked DS200UCPBG5AFB and that its i/o engine cpu board form, connectors and revision agree with the approved GE Mark V and Mark VI Turbine Controls receiving record.
For DS200UCPBG5AFB, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact DS200UCPBG5AFB record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
DS200UCPBG5AFB technical scope: Functional Acronym: UCPB; PCB Coating Style: Normal Coating; System Platform: GE Speedtronic Mark V and Mark VI turbine-control architecture; Functional Role: I/O Engine CPU Board function in the documented GE Mark V and Mark VI Speedtronic architecture; Interface Basis: Matching connectors, terminal boards and rack hardware.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match DS200UCPBG5AFB to the approved GE Mark V and Mark VI Turbine Controls receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected i/o engine cpu board path.
Obsolete/Discontinued by OEM
DS200UCPBG5AFB is a General Electric i/o engine cpu board associated with the GE Mark V and Mark VI Turbine Controls platform. It interfaces the documented field signals with the control system through the assigned channels, terminals and installed I/O position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.