Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China

The General Electric IS200TBCIS2CCD is a contact input termination board for GE Mark VIe industrial automation applications. Documented product details include Mark VI Turbine Control System Series; Mark VI IS200 Series; Discrete input terminal board. Confirm the complete model code, hardware revision and supplied condition against the installed equipment before replacement.
Verify that the supplied item is marked IS200TBCIS2CCD and that its contact input termination board form, connectors and revision agree with the approved GE Mark VIe receiving record.
For IS200TBCIS2CCD, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact IS200TBCIS2CCD record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
IS200TBCIS2CCD technical scope: Series: Mark VI Speedtronic; Functional Acronym: TBCI; PCB Coating: S-style PCB coating; Product Type: Termination Board; Hardware Format: Printed circuit board assembly.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match IS200TBCIS2CCD to the approved GE Mark VIe receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected contact input termination board path.
Active / Available from OEM
IS200TBCIS2CCD is a General Electric contact input termination board associated with the GE Mark VIe platform. It interfaces the documented field signals with the control system through the assigned channels, terminals and installed I/O position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.