Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China
IS200BPPBH2BJD IS200AEPCH1ABC is a GE mark vie power distribution assembly used within the GE Speedtronic turbine-control architecture. It provides the specified mark vie power distribution assembly function while retaining the complete order code, hardware execution and receiving-system compatibility during replacement. Its documented category series is Mark VI IS200.
Verify that the supplied item is marked IS200BPPBH2BJD IS200AEPCH1ABC and that its mark vie power distribution assembly form, connectors and revision agree with the approved GE Mark VIe receiving record.
For IS200BPPBH2BJD IS200AEPCH1ABC, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact IS200BPPBH2BJD IS200AEPCH1ABC record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
IS200BPPBH2BJD IS200AEPCH1ABC technical scope: Category Series: Mark VI IS200; Functional Acronym/Abbreviation: BPPB; Assembly Style: Normal Assembly; Product Type: Safety I/O Pack; Series: GE Mark VIe.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match IS200BPPBH2BJD IS200AEPCH1ABC to the approved GE Mark VIe receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected mark vie power distribution assembly path.
Active / Available from OEM
IS200BPPBH2BJD IS200AEPCH1ABC is a General Electric mark vie power distribution assembly associated with the GE Mark VIe platform. It supports the documented automation function assigned to its installed module, rack or cabinet position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.