Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China
The General Electric IS200STAIH2ACB is a analog i/o module for GE Mark VIe industrial automation applications. Documented product details include I/O Analog Module; Mark VI Turbine Control System Series; GE Boards & Turbine Control; Series: Mark VI IS200. Confirm the complete model code, hardware revision and supplied condition against the installed equipment before replacement.
Verify that the supplied item is marked IS200STAIH2ACB and that its analog i/o module form, connectors and revision agree with the approved GE Mark VIe receiving record.
For IS200STAIH2ACB, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact IS200STAIH2ACB record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
IS200STAIH2ACB technical scope: Category Series: Mark VI Speedtronic; Product Type: Analog I/O module; Functional Acronym (Abbreviation): STAI; Mounting Site: STAI Site (labeled); Mounting Strategy: Standard DIN Rail.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match IS200STAIH2ACB to the approved GE Mark VIe receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected analog i/o module path.
Active / Available from OEM
IS200STAIH2ACB is a General Electric analog i/o module associated with the GE Mark VIe platform. It interfaces the documented field signals with the control system through the assigned channels, terminals and installed I/O position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.