Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China

The General Electric IS200VTCCH1CBD is a thermocouple input card for GE Mark VIe industrial automation applications. Documented product details include Mark VI Turbine Control System Series; Series: Mark VI IS200; GE Boards & Turbine Control. Confirm the complete model code, hardware revision and supplied condition against the installed equipment before replacement.
Verify that the supplied item is marked IS200VTCCH1CBD and that its thermocouple input card form, connectors and revision agree with the approved GE Mark VIe receiving record.
For IS200VTCCH1CBD, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact IS200VTCCH1CBD record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
IS200VTCCH1CBD technical scope: Product Type: Thermocouple Input Card; Functional Acronym: VRTD; Category Series: Mark VI IS200; Power Consumption: Less than 1.5W; Operating Temperature Range: -40°C to +85°C.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match IS200VTCCH1CBD to the approved GE Mark VIe receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected thermocouple input card path.
Active / Available from OEM
IS200VTCCH1CBD is a General Electric thermocouple input card associated with the GE Mark VIe platform. It interfaces the documented field signals with the control system through the assigned channels, terminals and installed I/O position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.