Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China

The General Electric IS200BPVCG1BR1 is a backplane asm interface board for GE Mark VIe industrial automation applications. Documented product details include Mark VI Turbine Control System Series; Series: Mark VI IS200; GE Boards & Turbine Control. Confirm the complete model code, hardware revision and supplied condition against the installed equipment before replacement.
Verify that the supplied item is marked IS200BPVCG1BR1 and that its backplane asm interface board form, connectors and revision agree with the approved GE Mark VIe receiving record.
For IS200BPVCG1BR1, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact IS200BPVCG1BR1 record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
IS200BPVCG1BR1 technical scope: Series: Mark VI Speedtronic; Functional Acronym: BPVC; Functional Description: Backplane ASM Interface; PCB Coating: Normal Coating; Voltage Supply: 120/240VAC.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match IS200BPVCG1BR1 to the approved GE Mark VIe receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected backplane asm interface board path.
Active / Available from OEM
IS200BPVCG1BR1 is a General Electric backplane asm interface board associated with the GE Mark VIe platform. It supports the documented control, interface or signal-processing duty assigned to its installed board position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.