Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China
IS420CCGAH2A is a GE control communication gateway module used within the GE Speedtronic turbine-control architecture. It provides the specified control communication gateway module function while retaining the complete order code, hardware execution and receiving-system compatibility during replacement. Its documented power supply is 24 VDC.
Verify that the supplied item is marked IS420CCGAH2A and that its control communication gateway module form, connectors and revision agree with the approved GE Mark VIe receiving record.
For IS420CCGAH2A, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact IS420CCGAH2A record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
IS420CCGAH2A technical scope: Power Supply: 24 VDC; Current Load: 500 mA max@ 24 VDC; Operating Temperature: –20 to 50°C (–4 to 122°F); Storage Temperature: –40 to 85°C (–40 to 185°F); Relative Humidity: 5 to 95% (non-condensing).
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match IS420CCGAH2A to the approved GE Mark VIe receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected control communication gateway module path.
Active / Available from OEM
IS420CCGAH2A is a General Electric control communication gateway module associated with the GE Mark VIe platform. It supports the documented industrial communication path between the controller, network and connected automation equipment. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.