Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China
The General Electric MTM-120-P-A20 is a meter transducer module for GE Multilin industrial automation applications. Documented product details include 90-140 VAC, designed for; power monitoring and control; Linear Transducer by MULTILIN. Confirm the complete model code, hardware revision and supplied condition against the installed equipment before replacement.
Verify that the supplied item is marked MTM-120-P-A20 and that its meter transducer module form, connectors and revision agree with the approved GE Multilin receiving record.
For MTM-120-P-A20, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact MTM-120-P-A20 record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
MTM-120-P-A20 technical scope: CONTROL POWER: 90-140 V AC; MAX CONTACT RATING: 250 V AC; Current consumption: 5 AMP; Capacity: 1/2-1/4 HP; Nominal Current: 4-20 MA.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match MTM-120-P-A20 to the approved GE Multilin receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected meter transducer module path.
Obsolete/Discontinued by OEM
MTM-120-P-A20 is a General Electric meter transducer module associated with the GE Multilin platform. It supports the documented automation function assigned to its installed module, rack or cabinet position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.