Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China

The General Electric PQM-T20-C-A is a multin power quality meter for the GE Multilin platform. It performs its documented equipment function within the installed industrial system. Confirm the complete model code, hardware revision, interfaces and supplied condition against the installed equipment before replacement.
Verify that the supplied item is marked PQM-T20-C-A and that its multin power quality meter form, connectors and revision agree with the approved GE Multilin receiving record.
For PQM-T20-C-A, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact PQM-T20-C-A record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
PQM-T20-C-A technical scope: Measurement System: True RMS electrical measurement with digital signal processing; Measured Parameters: Voltage, current, frequency, active power, reactive power, apparent power, power factor, energy consumption; Communication Interface: Industrial fieldbus (e.g., Modbus RTU/TCP or equivalent); Display System: LCD/graphical interface with multi-parameter real-time visualization; Application Domains: Power distribution systems, industrial automation, substations, renewable energy monitoring, energy management systems.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match PQM-T20-C-A to the approved GE Multilin receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected multin power quality meter path.
Obsolete/Discontinued by OEM
PQM-T20-C-A is a General Electric multin power quality meter associated with the GE Multilin platform. It supports the documented automation function assigned to its installed module, rack or cabinet position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.