Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China
PQMII-T20-C-A is a GE power quality meter used within the GE Multilin power-quality monitoring platform. It provides the specified power quality meter function while retaining the complete order code, hardware execution and receiving-system compatibility during replacement. Its documented primary function is Power Quality Meter.
Verify that the supplied item is marked PQMII-T20-C-A and that its power quality meter form, connectors and revision agree with the approved GE Multilin receiving record.
For PQMII-T20-C-A, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact PQMII-T20-C-A record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
PQMII-T20-C-A technical scope: Primary Function: Power Quality Meter; Hardware Form: panel-mounted power quality meter; Installation Match: PQMII-T20-C-A receiving hardware; Interface Basis: Exact PQMII-T20-C-A connectors and terminals; Commissioning Check: Function-test the affected power quality meter path.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match PQMII-T20-C-A to the approved GE Multilin receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected power quality meter path.
Obsolete/Discontinued by OEM
PQMII-T20-C-A is a General Electric power quality meter associated with the GE Multilin platform. It supports the documented automation function assigned to its installed module, rack or cabinet position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.