Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China

The General Electric SR489-RELAY is a generator management relay for the GE Multilin platform. It performs the documented protection and monitoring functions for the installed electrical system. Confirm the complete model code, hardware revision, interfaces and supplied condition against the installed equipment before replacement.
Verify that the supplied item is marked SR489-RELAY and that its generator management relay form, connectors and revision agree with the approved GE Multilin receiving record.
For SR489-RELAY, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact SR489-RELAY record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
SR489-RELAY technical scope: Product type: 489 Generator Management Relay; Current Input Relays: P5 = 5 A phase CT secondaries; Power Supply Options: LO = DC: 24 – 60 V; AC: 20 – 48 V @ 48 – 62 Hz; Analogue Outputs: A20 = 4 – 20 mA analog outputs; Series: GE Multilin.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match SR489-RELAY to the approved GE Multilin receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected generator management relay path.
Obsolete/Discontinued by OEM
SR489-RELAY is a General Electric generator management relay associated with the GE Multilin platform. It supports the documented monitoring, protection, alarm and trip functions assigned to the protected equipment. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.