Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China
GE Multilin UR8AH is a CT/VT module for Universal Relay equipment with three phase-current inputs, one ground-current input and four voltage inputs.
The current inputs support the documented 1 A or 5 A secondary application; match the UR relay, terminal assignment and protection settings.
Verify that the supplied item is marked UR8AH and that its multilin ct/vt input module form, connectors and revision agree with the approved GE Multilin receiving record.
For UR8AH, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact UR8AH record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
UR8AH technical scope: Product Type: CT/VT input module; Relay Family: GE Multilin Universal Relay; Phase CT Inputs: 3; Ground CT Inputs: 1; VT Inputs: 4.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match UR8AH to the approved GE Multilin receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected multilin ct/vt input module path.
Obsolete/Discontinued by OEM
UR8AH is a General Electric multilin ct/vt input module associated with the GE Multilin platform. It interfaces the documented field signals with the control system through the assigned channels, terminals and installed I/O position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.