Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China
DS200PCCAG1ADB is a GE power connect board used within the GE Speedtronic Mark V and Mark VI turbine-control architecture. It provides the specified power connect board function while retaining the complete order code, hardware execution and receiving-system compatibility during replacement. Its documented pcb coating is Normal Coating.
Verify that the supplied item is marked DS200PCCAG1ADB and that its power connect board form, connectors and revision agree with the approved GE Mark V and Mark VI Turbine Controls receiving record.
For DS200PCCAG1ADB, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact DS200PCCAG1ADB record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
DS200PCCAG1ADB technical scope: PCB Coating: Normal Coating; System Platform: GE Speedtronic Mark V and Mark VI turbine-control architecture; Functional Role: Power Connect Board function in the documented GE Mark V and Mark VI Speedtronic architecture; Hardware Format: turbine-control board, terminal board or rack assembly; Interface Basis: Matching connectors, terminal boards and rack hardware.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match DS200PCCAG1ADB to the approved GE Mark V and Mark VI Turbine Controls receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected power connect board path.
Obsolete/Discontinued by OEM
DS200PCCAG1ADB is a General Electric power connect board associated with the GE Mark V and Mark VI Turbine Controls platform. It supports the documented control, interface or signal-processing duty assigned to its installed board position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.