Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China
DS200SLCCG3AGH is a GE lan commuication board used within the GE Speedtronic Mark V and Mark VI turbine-control architecture. It provides the specified lan commuication board function while retaining the complete order code, hardware execution and receiving-system compatibility during replacement. Its documented functional acronym is SLCC.
Verify that the supplied item is marked DS200SLCCG3AGH and that its lan commuication board form, connectors and revision agree with the approved GE Mark V and Mark VI Turbine Controls receiving record.
For DS200SLCCG3AGH, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact DS200SLCCG3AGH record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
DS200SLCCG3AGH technical scope: Functional Acronym: SLCC; PCB Coating: Normal Coating; Power Supply: 24 V DC; Operating Temperature: -40°C to +70°C; Interface Basis: Matching connectors, terminal boards and rack hardware.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match DS200SLCCG3AGH to the approved GE Mark V and Mark VI Turbine Controls receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected lan commuication board path.
Obsolete/Discontinued by OEM
DS200SLCCG3AGH is a General Electric lan commuication board associated with the GE Mark V and Mark VI Turbine Controls platform. It supports the documented control, interface or signal-processing duty assigned to its installed board position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.