Registered Address: 32D Floor Guomao Building, No.388, Hubin South Road, Siming District, Xiamen,Fujian, China

The General Electric IS215WEPAH2BDA is a printed circuit board for GE Mark VIe industrial automation applications. Documented product details include Wind Energy Pitch Axis; Mark VI Turbine Control System Series; GE Boards & Turbine Control; Mark VIe & Mark VIeS Control Systems. Confirm the complete model code, hardware revision and supplied condition against the installed equipment before replacement.
Verify that the supplied item is marked IS215WEPAH2BDA and that its printed circuit board form, connectors and revision agree with the approved GE Mark VIe receiving record.
For IS215WEPAH2BDA, state the required condition, quantity, installed position, connected assemblies and document requirements in the written enquiry.
Apply only parameters supported by the exact IS215WEPAH2BDA record or a documented family source. Do not infer electrical ratings or interchangeability from appearance.
IS215WEPAH2BDA technical scope: Product Type: Printed Circuit Board; Category Series: Mark VIe & Mark VIeS; Functional Acronym: WEPA; PCB Coating: Conformal Coating; Communication Type: 2 RS-485 interfaces.
Use these values only for the listed hardware execution and verify the supplied label before installation.
Match IS215WEPAH2BDA to the approved GE Mark VIe receiving position, connector or terminal arrangement and configuration record.
After power restoration, review diagnostics and test the affected printed circuit board path.
Active / Available from OEM
IS215WEPAH2BDA is a General Electric printed circuit board associated with the GE Mark VIe platform. It supports the documented control, interface or signal-processing duty assigned to its installed board position. Correct selection depends on the complete model code, connector or terminal arrangement, hardware revision and receiving-system configuration. Before replacement, compare the original product label, installed slot or cabinet reference, connected assemblies and approved project records. After installation, review system diagnostics and function-test every affected channel, control path, protection function or communication link before returning the equipment to service.