Honeywell's March 2018 Fieldbus Interface Module guide identifies DC-TFB412 as the redundant Input/Output Termination Assembly for a Series C Mark II FIM4 installation. It connects primary and secondary Series C FIMs to four H1 links and their FTE cables and mounts on the Mark II backplane. The additional website number 51307618-176 is not mapped by the reviewed Honeywell guide and therefore requires label or order-record confirmation.
Honeywell's Series C Fieldbus Interface Module User's Guide identifies DC-TFB412 in the Series C Mark II component table as the redundant FIM4 Input/Output Termination Assembly. The table says the assembly provides physical connections for primary and secondary Series C FIMs, H1 links and FTE cables and mounts on the Series C Mark II backplane. The exact connector-location figure shows two FIM positions, four H1 fieldbus connectors, paired yellow and green FTE ports and binary-coded decimal switches used to set the FTE device index.
The website title appends 51307618-176, but the reviewed Honeywell guide does not associate that number with DC-TFB412. This page therefore keeps the original website identity visible while separating the verified base-model facts from the unverified numeric suffix. Before supply, compare the full physical label, hardware revision, connector population and backplane arrangement with the installed assembly and obtain a traceable OEM order record or other exact-item evidence for the additional number. Do not apply voltage, current, temperature or weight claims from reseller pages or adjacent IOTA models.
Honeywell's March 2018 component table identifies DC-TFB412 as a redundant Input/Output Termination Assembly for FIM4. It connects primary and secondary Series C FIMs, four H1 links and FTE cables and mounts on a Series C Mark II backplane. These functions apply to the exact base model, not automatically to every nearby catalog number.
The exact Honeywell drawing shows two vertically arranged FIM positions, four H1 link connectors, two yellow FTE and two green FTE connections, combination cables and device-index switches. Record every installed cable position and device-index value before removal, then restore the approved redundant arrangement and verify both network paths after installation.
The reviewed Honeywell guide does not map 51307618-176 to DC-TFB412. Preserve that additional website number for receiving inspection, but do not claim interchangeability or specifications from a reseller association. A clear supplied-item label, traceable Honeywell order record or later exact manufacturer parts table must confirm the combined identity before shipment or commissioning.
Verify DC-TFB412 on the physical assembly and obtain exact-item evidence for 51307618-176. Record the installed device-index switch setting, both FIM positions, four H1 link assignments, yellow and green FTE cable locations, connector keys and backplane position. Confirm that the receiving cabinet is the documented Series C Mark II arrangement and that the planned primary and secondary modules are compatible with the approved FIM4 design.
Follow the site isolation and electrostatic-discharge procedure before disturbing the redundant fieldbus assembly. Label every H1 and FTE cable, preserve the device-index value and replace the IOTA only with the exact verified execution. After installation, confirm both FIMs are recognized, the primary and secondary states are correct, every H1 link communicates, both FTE paths are healthy and all affected fieldbus devices return without unresolved configuration or hardware diagnostics.