Request a Parts Quote
Name
Company *
Phone *
Email *
Address
City
State / Province / Region
Zipcode
Country
Quantity *
Part Number *
Manufacturer
Preferred Condition
Additional Information
Cancel
ICS Triplex T9030
ICS Triplex T9030
  • ISO 9001:2015 Certified

    Our quality management system covers sourcing,testing and dispatch
  • View Our Success Stories

    Real stories from real customer orders
In Stock
Ships by Saturday, November 7
Fast Shipping Available
OPC Portal Server

T9030

Product Information:

T9030 is a ICS Triplex opc portal server used within the ICS Triplex safety and critical-control platform. It provides the specified opc portal server function while retaining the complete order code, hardware execution and receiving-system compatibility during replacement. Its documented category series is AADvance Controllers.

Product image is representative; revision or series may vary. Contact us to request a specific version.
  • One-year warranty
  • Global shipping
  • Exact-model verification
    • PRODUCT OVERVIEW

      What is this product?

      T9030 belongs to the ICS Triplex safety automation and performs the documented opc portal server role in the ICS Triplex safety and critical-control platform. The retained technical evidence records Category Series: AADvance Controllers; CPU Utilized: Up to 350 MHz; RAM Memory Size: 128 MByte. The full marking, receiving hardware, connectors or terminals, configuration dependencies and installed position must be matched before substitution.

      Selection basis

      Select T9030 by its complete hardware identity and the approved receiving-system record; appearance alone does not establish interchangeability.
    • APPLICATIONS

      Where it may be used

      Typical industries for the documented opc portal server execution.

      Oil and Gas

      Supports opc portal server duties in safety-instrumented and shutdown systems.

      Chemical Plants

      Maintains qualified safety signals in continuous process units.

      Power Utilities

      Supports protection and shutdown functions in plant auxiliary systems.

      Process Safety

      Restores the documented ICS Triplex safety automation hardware during planned outages.
Technical specifications for

T9030

0 TECHNICAL PARAMETERS
  • Manufacturer:
    ICS Triplex
  • Product Category:
    Safety Automation
  • Product Type:
    OPC Portal Server
  • CPU Utilized:
    Up to 350 MHz
  • RAM Memory Size:
    128 MByte
  • Hard drive space:
    300 MB
  • Operating system support:
    Supports Windows XP (SP3) 32/64-bit, Windows 7 Professional, and Windows Server
  • Operating Range:
    24 Volts DC
  • Product Series:
    ICS Triplex safety automation
  • System Platform:
    ICS Triplex safety and critical-control platform
  • Stock Availability:
    9
WHAT HAPPENS NEXT?

From enquiry to delivery

Six clear steps show what information is required and what the written quotation will contain.
  • 01

    Find the product

    Search the part number or send an inquiry for obsolete, discontinued or hard-to-find parts.
  • 02

    Provide the details

    Share the exact part number, quantity, condition, revision, destination and any required certificates or photos.
  • 03

    Review the quotation

    Receive price, currency, condition, availability, warranty, lead time, shipping terms and quotation validity in writing.
  • 04

    Confirm the order

    Accept the quotation in writing and complete the required payment before shipment.
  • 05

    Pay by bank transfer

    Pay the full invoiced amount by bank wire in RMB/CNY, GBP, EUR or USD using the official invoice details.
  • 06

    Verify and dispatch

    The item receives a pre-shipment inspection and suitable protective packaging. Functional testing is performed only where appropriate equipment and procedures are available for the specific item. We confirm the applicable inspection scope and provide tracking after dispatch.
BUYER INFORMATION

Product condition level information

Commercial details are confirmed in writing before payment.
  • 01

    Factory Sealed

    Unused product with the original factory seal intact; packaging age or storage marks may still be present.

  • 02

    Original Pack

    Unused product in original manufacturer packaging that was not originally factory sealed.

  • 03

    Factory New

    New and current product sourced through the manufacturer or authorized supply channel when expressly confirmed in the quotation.

Alternative Names

ICS Triplex T9030 ICS Triplex Trusted T9030 T9030 OPC Portal Server

Information

Overview Manuals Board Function Hardware Review Installation Review

Features:

  • OPC Portal Server for the documented ICS Triplex safety automation.
  • Category Series: AADvance Controllers.
  • CPU Utilized: Up to 350 MHz.
T9030 belongs to the ICS Triplex safety automation and performs the documented opc portal server role in the ICS Triplex safety and critical-control platform. The retained technical evidence records Category Series: AADvance Controllers; CPU Utilized: Up to 350 MHz; RAM Memory Size: 128 MByte. The full marking, receiving hardware, connectors or terminals, configuration dependencies and installed position must be matched before substitution.

For installation, retain the ICS Triplex safety automation receiving position, connector or terminal arrangement and configuration record. After power restoration, review diagnostics and test the affected operating path before process release.

The T9030 OPC Portal Server is supplied only after the complete hardware identity, condition and current OEM lifecycle status have been confirmed.
ICS Triplex T9030 OPC Portal Server Manual(Datasheets), LinkImportant Notice: The linked document or internal product-family information must identify the listed model or its documented family. Confirm the complete order code, hardware revision and installed-system requirements before replacement. Accessories, cables, software and certificates are included only when stated in the quotation. All prices are shown in USD.

Board Function: T9030 performs the opc portal server function within the ICS Triplex safety automation. The retained documentation identifies category series as AADvance Controllers; apply that value only to this documented execution.

Match the complete label, hardware form and functional position before transferring any setting, cable or termination from the removed unit.

Hardware Review: approve T9030 only for the documented ICS Triplex safety and critical-control platform. Compare rack, carrier or panel generation, connector keying, terminal numbering and all paired assemblies with the installation drawings.

Photograph both sides and the installed position before removal so revision markings, jumpers, addressing and channel allocation can be reconstructed accurately.

Installation Review: isolate the equipment, remove stored energy and inspect the receiving hardware before installing T9030.

Restore power in the approved sequence, review status and diagnostics, then test every affected control, signal, relay, communication, protection or monitoring path against the commissioning record.

Technical notes

T9030 must be selected and serviced as the exact opc portal server identified by its complete hardware marking. Preserve the ICS Triplex safety automation receiving position, connected hardware, configuration record and every affected control, I/O, communication, protection or monitoring dependency during replacement.

Board Evidence

Verify that the supplied item is marked T9030 and that its opc portal server form, faceplate, connectors and printed revision agree with the approved ICS Triplex safety automation receiving record.

Retained product evidence for this execution includes Category Series: AADvance Controllers; CPU Utilized: Up to 350 MHz. Use photographs of the label and installed position to resolve ambiguity before shipment or installation.

System Evidence

For T9030, provide the installed ICS Triplex safety and critical-control platform, required condition, quantity, receiving slot or mounting position and every connected terminal, cable or carrier assembly.

Record revision restrictions, configuration or calibration dependencies, testing requirements and required certificates so the quoted opc portal server matches the maintenance scope.

Customs & shipping dimensions / weight

  • Packed shipping dimensions
    Confirmed after final packing
    Bare-item dimensions from the existing exact-model product record: 2.2 x 12.4 x 12.6 cm. Final packed dimensions are confirmed after packing.
  • Packed shipping weight
    Confirmed after final packing
    Bare-item net weight from the existing exact-model product record: 12.5 kg. Final packed weight is confirmed after packing.
  • HS / customs code
    8538900000
    Indicative China HS classification for industrial control-equipment part; final classification is confirmed by the customs declarant.
  • Country of origin
    Confirm from supplied item
    Origin is verified against the supplied item and applicable manufacturer documentation.
  • Ships from
    Xiamen, Fujian, China
    The dispatch location is confirmed in the written quotation.
  • Customs documents
    Confirmed for the destination
    Invoice, packing-list and origin-document requirements are agreed with the order.
PRODUCT & ORDER FAQS

Questions buyers ask about T9030

  • How is the exact T9030 execution confirmed?

    Read the complete T9030 marking, including every suffix and companion code, then compare the faceplate, connectors and installed-system record before approval.
  • Which installed platform must T9030 match?

    It must match the ICS Triplex safety and critical-control platform, including the receiving rack, carrier or panel generation and the approved project configuration.
  • Which function does T9030 perform in the system?

    T9030 performs the documented opc portal server role within the ICS Triplex safety automation; do not transfer the role from a visually similar part number.
  • Which category series applies to T9030?

    The retained documentation records category series as AADvance Controllers; verify the supplied execution carries the same specification.
  • Which interfaces should be checked before fitting T9030?

    Compare connector keying, terminal numbering, field supply, grounding, shielding, cable assemblies and every paired termination against the approved drawings.
  • Which configuration records are needed for T9030?

    Retain the slot or node assignment, channel map, firmware or logic dependencies, calibration data where applicable, and the approved ICS Triplex safety automation project record.
  • How should T9030 be tested after installation?

    Restore power in the approved sequence, review status and diagnostics, then function-test every affected channel, relay, network, control, protection or monitoring path.
  • Can another revision replace T9030 without review?

    No direct interchangeability should be assumed. Compare the full code, cpu utilized (Up to 350 MHz), ram memory size (128 MByte) and receiving-system documentation first.
MORE PARTS IN THE SAME PROJECT?

Search another part number

Use the exact manufacturer number where possible.
WHY BUYERS WORK WITH MOORE AUTOMATED

Clear checks before you commit

Product-specific verification and written commercial details help purchasing and maintenance teams reduce mismatch risk.
  • Pre-shipment inspection

    Products are inspected before dispatch to verify model, condition and applicable specifications.
  • Documentation available

    Product photos, packaging photos, certificates and datasheets can be provided when available.
  • Clear commercial terms

    Condition, warranty, lead time, included items and shipping terms are stated clearly in writing.
  • 20+ years of experience

    Over 20 years of experience in industrial automation and hard-to-source legacy parts.
  • Product Lifecycle Stage

    Confirm the current OEM lifecycle stage for T9030 against manufacturer records at quotation. The supplied opc portal server is matched by its complete hardware identity, revision and included assemblies.

    Any alternative is proposed only after the receiving ICS Triplex safety and critical-control platform, interfaces, configuration dependencies and commissioning requirements have been reviewed.

Trusted by 5,000+ plants worldwide | Backed by our vast inventory of top-tier control parts, drives and servo motors, fast shipments are dispatched to cover your urgent needs. ABOUT US >>
Moore Disclaimer: Moore Automated's sales automation equipment and related solutions are intended for industrial automation and business operational efficiency improvement purposes only. Product information, technical parameters, and application cases are for reference only and do not constitute an absolute guarantee of performance for any specific industry, scenario, or final application. Actual equipment performance may vary depending on factors such as the usage environment, system integration method, and maintenance conditions. Users should confirm compatibility and safety based on professional technical assessments. Moore Automated assumes no liability for any direct or indirect losses caused by improper use, modification, or failure to operate according to specifications, to the extent permitted by law.

Get a quick price for:

T9030
Quantity
Upload
(gif, jpg, jpeg, png, bmp, doc, docx, xls, xlsx, ppt, pdf, csv)
For more information on how your data is processed and stored by Moore Automated please read our privacy policy.